You’re offline. This is a read only version of the page.
Toggle navigation
Solicitations
Vendors
Contract Extensions
Sign in
Home
Solicitations
City of Havelock, 2024 Aeration Piping at the Waste Water Treatment Facility
City of Havelock, 2024 Aeration Piping at the Waste Water Treatment Facility
All bids are open for the public to view, but this solicitation is no longer accepting responses.
Return to Search
Respond to Solicitation
Solicitation Number
*
Department
Status Reason
Pending Selection
Opening Date
Posted Date
*
Commodity Code
Mandatory Conference/Site Visit
—
—
Special Instructions
—
Description
Objective: Replace the aeration piping within the wasting basin at the Waste Water Treatment Facility in Havelock, NC. Scope: The Wasting Basin at the Waste Water Treatment Plant in Havelock, NC. is a 14’ deep / 16’ wide / 60’ long concrete basin. This basin utilizes diffused bubble aeration with 6” stainless steel aeration pipe to stir the sediments within bottom of the basin. Currently the aeration piping has broken at a flange joint and dislodged from the cradles and is now broken. The submersible aeration piping is stainless steel piping but is tied to carbon steel on the top of the basin. The piping to be replaced is all of the stainless-steel aeration pipe from the area where the stainless steel adjoins to the carbon steel. See figure 5. All Course Bubble Diffusers are to be replaced as well. The aeration piping within the Wasting Basin is a total of 70 lineal feet and sits approximately 2’ off the floor of the Wasting Basin. The vertical section is approximately 11’, there are two portions of horizontal piping one approximately 7’ and the other approximately 52’. There are two 90-degree LR elbows, one connecting the vertical piping to the horizontal piping and the other connecting the 7’ pipe to the 52’ pipe section. See figure 2. The end of the 52’ section will be sealed with a weldable cap. A site visit is highly encouraged but not mandatory. The contractor will be responsible for following all OSHA confined space procedures. The contractor will be responsible for supplying all confined space equipment. All measurements are approximate, contractor to verify. The City of Havelock shall not be held responsible for omissions or errors in description. The contractor shall be responsible for furnishing all materials, supplies, labor, and equipment necessary for the completion of this project.
Attachments
There are no notes to display.
You don't have permissions to view notes.
Error completing request.
Loading...
Loading...
Addenda
Created On
. sort ascending
Name
. sort descending
Addendum / Change Description
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Tabulations
Vendor
. sort ascending
HUB Status
. sort descending
NCSBE Status
. sort descending
State of NC
. sort descending
Non-Profit Work Center
. sort descending
Disabled Business Enterprise
. sort descending
Delivery
. sort descending
Total Price
. sort descending
Actions
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Awards
Vendor
. sort descending
Award Amount
. sort descending
Date Awarded
. sort ascending
Actions
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.