You’re offline. This is a read only version of the page.
Toggle navigation
Solicitations
Vendors
Contract Extensions
Sign in
Home
Solicitations
Solicitation Details
Solicitation Details
Respond to Solicitation
Respond to Solicitation
×
Close
Solicitation Number
*
Department
Status Reason
Open
Opening Date
Posted Date
*
Commodity Code
Mandatory Conference/Site Visit
Special Instructions
Solicitation Type
*
RFP
IFB
RFI
Description
Lee County General Services is seeking qualified individual or company with experience in metal roofing to do roof repair work at the Lee County Gymnastics Building, 2105 Nash St, Sanford, NC. For additional information or questions, please contact General Services Director, Ryan Faulk, at 919-718-4622 or rfaulk@leecountync.gov. Scope of Work This project does require a commercial building permit from the City of Sanford Building Permitting and Inspections Department and all bidders must have proper licenses for contractors as required by State Law. Please provide your license number on the bid form. Remove existing ceiling insulation and replace with R-13 insulation with fire-resistant backing (like for like) on front half of building. This will involve removing the existing metal roofing panels. Existing metal panels will be reused. If metal panels are damaged during the removal process, they shall be replaced at the Contractor's expense like for like. Remove (16) skylights and replace with PBR JD Metal 24 ga Fluropan Sandstone color metal (or equal). Edges should be sealed with double sided butyl tape. Remove all metal roofing screws (front and back half of building) and replace with #12 x 2" metal to metal screws. Remove exhaust fan and related housing and flashing from roof and replace with supported metal cap. Remove and replace the existing metal rake. Install double sided butyl tape under the trim and at each joint on front half of the building to ensure metal is sealed. Remove and replace ridge cap. Gymnastics equipment directly under portion of the roof that is being worked on should be covered with plastic, tarps or the like to protect gym equipment, mats and concrete floor. Coverings will need to be removed daily before Contractor leaves the site. Contractor is responsible for all measurements. Include all labor, equipment rentals, dumpster rentals, porta john rentals, permit and inspection fees in your bid. Building should be kept in a watertight condition for duration of construction. Do not include sales tax in your base bid. See attached aerial imagery for site specific location information. Warranty Provide two-year workmanship and leak warranty.
Attachments
There are no notes to display.
You don't have permissions to view notes.
Error completing request.
Loading...
Loading...
Addenda
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Tabulations
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Awards
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
In This Section
Submit a Bid
Existing Bid