Description
The initial scope of work for the stormwater development plan is generally described within the following elements: (1) The Vendor will prepare a Stormwater Management Plan to include the following: • Review and update the Town’s existing stormwater policies and ordinances. • Develop stormwater goals and objectives that are tailored to the needs of the Town. • Specify requirements for existing and new development. • Establish water quality standards for runoff. • Develop an Operations and Maintenance Plan. (2) The Vendor will complete an asset inventory and condition assessment. • Provide the Town with bi-weekly reports including areas mapped, stormwater maintenance issues found and issues encountered in the field. • Gather data and coordinate with Town to provide information regarding current stormwater assets, access to properties, pipe inspections, the development of stormwater infrastructure database as well as update information previously evaluated. • Establish a georeferenced database of the Town’s infrastructure in GIS platform and include attributes such as pipe size, material, condition, etc. that can be used to develop a capital improvement plan to repair deteriorating infrastructure and long- term management strategy. • Inspect and document defects and other issues with the stormwater pipe system with the Town’s Right-of-Way via Closed Circuit TV (CCTV) inspection. • Complete a stormwater condition assessment report to include a summary of the condition assessment of the drainage structures and stormwater pipe system. o Identify deficiencies in the stormwater system. o Identify and prioritize drainage system improvements. o Identify opportunities for system retrofits using traditional and green infrastructure projects. • Work with Town staff to incorporate projects into the Town’s current CIP priority ranking matrix. • Evaluate the need for permanent stormwater easements.
Attachments
There are no notes to display.
You don't have permissions to view notes.
Error completing request.
Loading...
Loading...
Addenda
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Tabulations
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
Awards
There are no records to display.
You don't have permissions to view these records.
Error completing request.
Loading...
Create
×
Close
Edit
×
Close
View details
×
Close
Delete
×
Close
Are you sure you want to delete this record?
Error
×
Close
We're sorry, an error has occurred.
In This Section
Submit a Bid
Existing Bid